All Products

26/35kV Single Core XLPE Insulated, Steel Wire Armored (SWA), PE Sheathed Power Cable with Water-Blocking
6-35Kv XLPE Insulated Cable
26/35kV Single Core XLPE Insulated, Steel Wire Armored (SWA), PE Sheathed Power Cable with Water-Blocking

This 26/35kV single-core power cable is engineered for maximum reliability in demanding utility and industrial applications. It features Cross-Linked Polyethylene (XLPE) insulation for superior electrical stability and a Water-Blocking (FS) construction designed to prevent longitudinal water ingress, making it ideal for underground, tunnel, or trench installations where moisture is a concern.

High-Strength Aerial Cable for Long-Span Distribution
Overhead Insulation Cable
High-Strength Aerial Cable for Long-Span Distribution

The JKLGYJ 10kV is a specialized overhead cable designed for challenging terrains and long-span installations. It features a Steel-Reinforced Aluminum Conductor (ACSR) core, which provides exceptional tensile strength to withstand high mechanical loads, combined with a weather-resistant XLPE insulation layer.

Reliable Medium Voltage Aerial Cable for Urban & Rural Distribution
Overhead Insulation Cable
Reliable Medium Voltage Aerial Cable for Urban & Rural Distribution

This 10kV Single Core Overhead Insulated Cable (Model: JD/JK Series) is designed for overhead power distribution systems where safety and reliability are paramount. Featuring a robust 300mm² conductor and weather-resistant XLPE insulation, it effectively prevents short circuits caused by tree contact or accidental touching.

Composite Electrical Equipment Enclosures/Shelters
Composite Electrical Equipment Enclosures/Shelters
Composite Electrical Equipment Enclosures/Shelters

These are high-performance, weatherproof structures designed to house and protect critical electrical equipment (switchgear, inverters, batteries, SCADA systems). unlike traditional metal containers (steel or ISO containers), these are manufactured using composite materials. They are the standard solution for harsh environments where metal would fail, such as: Coastal/Offshore: High salt spray areas (Oil & Gas platforms, coastal wind farms). Railways: Trackside signaling huts (non-conductive properties are vital). Chemical Plants: Environments with corrosive fumes. Remote Utilities: Substations where low maintenance is critical.

FAQ

Can you customize electrical equipment to meet my project's specific technical data?
Yes, customization is our strength. We understand that industrial projects often have unique requirements. Our engineering team can modify specifications—such as voltage, dimensions, and insulation materials—to ensure our cables, transformers, and switchgears fit your exact project needs.
What standards and certifications do your industrial products adhere to? +
We prioritize safety and compliance. Our products are manufactured in strict accordance with major international standards (such as IEC, IEEE, and ANSI) to ensure they perform reliably in demanding industrial environments, including factories, refineries, and power plants.
What is the typical lead time for a large-scale industrial order? +
Lead times vary based on the product type and customization level. generally, standard items ship within 5–7 working days, while custom-engineered industrial equipment (like large transformers) may take 20–30 days. We will provide a precise timeline in your quote to help you keep your project on schedule.
Do you offer logistical support for heavy or oversized shipments? +
Absolutely. Industrial equipment is often heavy and bulky. We handle the entire logistics process, including professional packaging, crate reinforcing, and coordination of sea or air freight, ensuring your equipment arrives safely at your site, anywhere in the world.
Do you provide technical support for installation and commissioning? +
Yes, we are committed to your success beyond just the sale. We provide comprehensive technical documentation, installation guides, and remote engineering support to assist your on-site team during the installation and commissioning phases.